Plate Nº 37 · recorded October 23, 2026

Space & AstronomyReported finding

Artemis III Will Rehearse Moon Landings in Earth Orbit in 2027

NASA's 2027 Artemis III mission will send four astronauts into Earth orbit for 14 days to rehearse dockings with Blue Origin and SpaceX lunar lander test vehicles.

By Elena Vasquez4 min read876 words

In brief

  1. Artemis III launches in 2027 for a 14-day crewed mission in low Earth orbit.
  2. Crew: NASA astronauts Randy Bresnik, Frank Rubio, Andre Douglas and ESA astronaut Luca Parmitano.
  3. Orion will dock with test articles of Blue Origin's Blue Moon Mark 2 and SpaceX's Starship V3.
  4. Crewed lunar landings near the Moon's South Pole are planned for 2028.
  5. Three spacecraft will fly on three different heavy-lift rockets, a NASA first.
NASA’s Artemis III Mission to Test Future Moon Lander Operations
Plate Nº 37NASA’s Artemis III Mission to Test Future Moon Lander Operations — Michael Mwangi / unsplash

NASA will launch a 14-day crewed dress rehearsal for Moon landings in 2027, sending four astronauts into low Earth orbit to practice docking with test versions of commercial lunar landers built by Blue Origin and SpaceX.

Artemis III will carry NASA astronauts Randy Bresnik, Frank Rubio and Andre Douglas, plus European Space Agency astronaut Luca Parmitano, aboard the Orion spacecraft. The goal is simple: reduce risk, validate hardware and build operational experience before NASA attempts crewed landings near the Moon's South Pole in 2028.

"Every piece of this mission in Earth orbit is designed to reduce risk before we put astronauts back on the Moon," said Jeremy Parsons, NASA's Artemis program manager. "We're launching three spacecraft on three different rockets and testing how they operate together — something NASA has never attempted. Every lesson we learn here gets us closer to landing on the Moon in 2028."

Earlier Artemis flights used only NASA's SLS rocket and Orion. This one adds two industry partners. That's new territory.

What happens with Blue Origin's lander?

The campaign starts with Blue Origin launching a test article of its Blue Moon Mark 2 lander into a circular orbit roughly 273 miles above Earth. The spacecraft can stay on orbit up to 30 days, giving schedulers room to maneuver.

NASA will launch Orion on SLS from Kennedy Space Center in Florida only days later, after confirming the lander is healthy. Orion will first enter an elliptical orbit stretching from 18 to 1,122 miles, then use its service module to circularize at about 345 miles for thermal stabilization before closing in on the waiting lander.

During the first two days of flight, the crew will check Orion's systems and position for docking. Then comes the mission's first major objective: linking up with the Blue Moon test vehicle. It's NASA's first chance to evaluate how Orion and a commercial lunar lander work together in space — software, guidance, communications and procedures, all in real conditions.

Once docked, astronauts will spend about two days aboard. They'll open the hatch, enter the cabin and assess controls, the cabin environment and life-support systems firsthand. Teams will verify the spacecraft can hold proper atmosphere and pressure. The test article carries many of the avionics, software, flight-control, crew-cabin and life-support technologies planned for real lunar missions — the first chance to see them work in orbit as an integrated vehicle.

Takeaway: NASA gets its first crewed look at a commercial lunar lander, on orbit, before anyone risks the real thing.

How does the Starship test work?

After undocking from Blue Moon, Orion will reposition for a second rendezvous. SpaceX will launch a Starship Version 3 test article from Florida later in the mission, since Starship is designed for a shorter on-orbit lifetime than Blue Moon's lander. It will enter a lower orbit at 206 nautical miles, optimized for communications coverage, with an added docking system at its nose.

Orion will dock with Starship in a test expected to last up to two hours. Crew will not enter the vehicle. The focus is how the two spacecraft behave as a docked system: controllability, communications, integrated software and the dynamics of docking and undocking.

The two campaigns also test different docking geometries. Orion connects beside Blue Moon's crew cabin, then aligns its forward docking system with Starship's nose port. Two approaches, one mission, double the engineering data.

Takeaway: one flight will prove Orion can work with two very different commercial lander designs.

What else will the crew test?

Plenty. After the Starship demonstration, the crew will have up to five additional days in orbit for secondary objectives, including:

  • Extra evaluations of the Orion Crew Survival System suits
  • Docking sensor tests
  • Acoustic and thermal measurements
  • Human-factors assessments
  • Science and technology demonstrations

Several investigations build on studies from Artemis II. The crew will run a proof-of-concept study on health assessments without direct contact with mission control — a key capability for missions far from Earth. NASA will also fly a cellular biology experiment, test concepts for returning and curating lunar samples, and assess Orion's environment for contamination risks.

Earth and solar observations will keep crew observation skills sharp, and plant seeds will fly aboard for post-mission science and education outreach. Mission planners built schedule flexibility into the timeline to capture more objectives if operations allow.

When ready, Orion will configure for reentry and splash down in the Pacific off the California coast, recovered by NASA personnel and the U.S. Navy.

Takeaway: even the spare days are packed with work that feeds later Moon and Mars missions.

Why rehearse in Earth orbit at all?

Because the stakes in 2028 are high. Artemis III gives NASA hands-on experience managing complex rendezvous and docking operations across three spacecraft and multiple commercial partners, plus insight into interoperability, mission-control coordination and hardware performance.

NASA frames the mission as part of a broader push: increasingly difficult flights near the lunar South Pole, an enduring human presence on the surface, and groundwork for the first crewed mission to Mars. The bottom line for 2027 — practice the landings in orbit, so the actual landings go smoothly.

via NASA Breaking News (Source)

Filed under

  • artemis-iii
  • nasa
  • moon-landings
  • orion-spacecraft
  • commercial-lunar-landers
Share this article:

More from Elena Vasquez

Elena Vasquez

Show full bio

Correspondent covering money, funding and market shifts around general science news at SciBeat.

262 articles

Nearby plates

« Previous article