Plate Nº 53 · recorded October 23, 2026

Space & AstronomyReported finding

NASA Reworks Moon Lander Plans for 2028 Crewed Landing

NASA has rewritten Artemis flight plans to land astronauts on the Moon in 2028, moving rendezvous orbits and reshaping contracts with SpaceX and Blue Origin.

By Marcus Bennett6 min read1,152 words

In brief

  1. NASA targets 2028 for the first crewed lunar landing, with a second landing opportunity to follow.
  2. Artemis III has been redefined as a low Earth orbit rendezvous and docking demonstration next year, not a landing.
  3. Blue Origin will use three transfer stages and an elliptical polar orbit instead of in-space propellant transfer.
  4. SpaceX's Starship will dock with Orion in Earth orbit and push it to low lunar orbit using a trans-lunar injection burn.
  5. Initial missions plan two Moonwalks of roughly two hours each, testing spacesuits from Axiom Space.
NASA, Partners Accelerate Lander Development for 2028 Moon Missions
Plate Nº 53NASA, Partners Accelerate Lander Development for 2028 Moon Missions — Chris Boyer / unsplash

NASA has set 2028 as the year American astronauts return to the lunar surface, and it has rewritten the flight plans for both of its commercial landers to hit that date. The agency and its two human landing system providers, Blue Origin and SpaceX, have streamlined the lander designs and changed both concepts of operations — the step-by-step choreography of each mission.

The changes reach deep into the Artemis architecture. NASA has redefined Artemis III: instead of landing, it will now demonstrate rendezvous and docking between test versions of landers from each provider and NASA's Orion spacecraft in low Earth orbit next year. In parallel, both companies continue to develop crew and cargo versions of their landers for the near-term Artemis missions.

What the administrators said

NASA Administrator Jared Isaacman framed the acceleration in blunt terms. "We are executing President Trump's National Space Policy to complete the long-awaited return of American astronauts to the lunar surface in 2028 and establish a Moon Base," he said. "We have a proven foundation in SLS and Orion, along with two lunar landers in development with Blue Origin and SpaceX. But NASA has no intention of sitting idly by as all the pieces come together. That is not how Apollo succeeded, and it is not how the near-impossible is achieved."

He added: "NASA is energized, our core capabilities are being rebuilt, our machine shops are running 24/7, and our experts are in the field attacking the critical path. We are building a Super Bowl-caliber team to safely achieve these objectives and everything that comes next."

What changed in the mission profile?

For the initial crewed missions, Artemis astronauts will launch in Orion atop the SLS (Space Launch System) rocket from NASA's Kennedy Space Center in Florida. During each mission, a commercial lander will link up with Orion, then carry two crew members to the lunar surface while two remain aboard Orion.

The biggest structural change: the landers and Orion will no longer rendezvous in a near-rectilinear halo orbit around the Moon — a stretched, lopsided orbit used in earlier plans. Each provider will instead use its own orbit, chosen to suit its hardware.

Both companies must fly an uncrewed demonstration mission with their crewed landers before the crewed Artemis missions. NASA will certify the lander systems before crews fly, to ensure safety and mission success.

How will SpaceX's Starship lander work?

SpaceX still plans to aggregate propellant in orbit — transferring super-cold, or cryogenic, liquid fuel between Starships in space. Multiple tanker Starships will launch to low Earth orbit ahead of the Starship Human Landing System (HLS) launch from Florida. Working like a gas station in orbit, the tankers will fill a depot Starship, which will then fuel the lander.

Under the revised operations:

  • Starship HLS will wait for Orion and its crew in Earth orbit, where the two spacecraft will rendezvous and dock.
  • The lander will perform a trans-lunar injection burn — the rocket firing that sends the stack toward the Moon — carrying Orion with it. NASA is modifying Orion so Starship can push it to the Moon.
  • Two crew members will ride Starship to the surface for several days before returning to Orion for the trip home.

The low-lunar-orbit approach significantly cuts the amount of propellant Starship must aggregate in space and shortens the time astronauts leaving the surface need to link back up with Orion. It also gives NASA flexibility in when the crew launches on SLS. SpaceX will demonstrate the propellant aggregation approach during its uncrewed demo flight.

How will Blue Origin's lander get there?

For its accelerated 2028 mission, Blue Origin will skip propellant transfer entirely and instead use three transfer stages to send its Blue Moon Mark 2 Alpha lander to the Moon. The stages, built from existing Mark 1 and Mark 2 hardware, work like a multistage rocket: they launch to low Earth orbit, the Mark 2 lander follows, the stack docks and departs for an elliptical polar orbit around the Moon, and each stage separates as its propellant runs out.

Compared with the previously planned near-rectilinear halo orbit, NASA says the elliptical polar orbit offers faster returns from the lunar surface to Orion, reduces the lander's propellant requirements, and maximizes the performance SLS can deliver. The orbit also gives SLS and Orion multiple launch opportunities to reach the lander. After Orion docks with the lander, two crew members transfer over and descend to the Moon's South Pole.

Blue Origin will fold in lessons from earlier robotic Mark 1 missions supporting NASA's Moon Base Program and will demonstrate the full mission profile in an uncrewed lander and transfer stage demonstration.

Who lands first?

NASA has not decided. Based on lander readiness, the agency will choose which company delivers astronauts to the surface — and back to lunar orbit — in 2028. A second crewed landing opportunity will follow. Under the original contracts, SpaceX's Starship was assigned to Artemis III and IV, while Blue Origin's Mark 2 was slated for Artemis V. Under the realignment, neither provider has a specific landing mission.

NASA is targeting two lunar surface Moonwalks, each roughly two hours long, during the initial missions. Astronauts will collect lunar samples and test the spacesuit provided by Axiom Space.

New contracts, new milestones

Earlier this year NASA updated its contracts with both companies for human landing systems and large cargo deliveries to the Moon. The updates align landing system requirements with the acceleration efforts announced earlier this year to streamline the Artemis architecture, expedite the lunar return, and support a higher mission cadence.

"NASA and our lunar lander providers Blue Origin and SpaceX have been working hand in hand to ensure we can return American astronauts to the Moon by 2028," said Jeremy Parsons, NASA's Artemis program manager. "While work to realign with our partners in support of architecture updates announced at Ignition Day in March has been underway since then, updating the contracts ensures NASA and its partners are on the same page with requirements and other milestones to ensure continued insight into lander development to support mission success and the safety of our Moon crews."

Both providers have added development milestones that give NASA deeper insight and reduce risk. SpaceX is adding two demonstrations of its crew cabin, called Cabin 1, for the Starship lander. Blue Origin is adding human-in-the-loop testing and hardware readiness milestones to streamline training development and ground and flight operations.

Beyond 2028, NASA plans to send Artemis astronauts on increasingly difficult missions near the lunar South Pole, explore more of the Moon than before, and use an enduring lunar presence as the foundation for the first crewed mission to Mars.

The takeaway: the 2028 date is fixed, the plans are not — and both lander teams are now racing the same clock.

via x.com (Original)

Filed under

  • nasa
  • artemis-program
  • moon-landing
  • spacex-starship
  • blue-origin-blue-moon
Share this article:

More from Marcus Bennett

Marcus Bennett

Show full bio

News editor covering regulation, policy and their impact on general science news at SciBeat.

272 articles

Nearby plates

« Previous article